Figure 5.2 - Island Multipurpose Point - 6 Hectare Rain Forest Island - Strategic Stop-Over Base (No Potable Water)

Island Multipurpose Point - 6 Hectare Rain Forest Island

Environmental Basaltic Evidence

Location: 500m offshore / 3,500m from main port (4,000m offshore until FS confirms) Size: ~6 Hectares Rain Forest Island with mangrove fringe Water Status: NO potable water - Natural well is saline (saltwater intrusion) - Confirmed by field test

Critical Constraints & Design Response:

Water Challenge:

Engineered Solution (Included in CAPEX):

  1. Construction Phase: BOREHOLE WATER Onshore mainland Base Area (5km) - €35K/month logistics
  2. Operational Phase:
    • 10m³/day containerized desalination (RO) + solar powered - €85K CAPEX
    • 200m³ rainwater harvesting from rooftops + storage tanks
    • Potable water loop from mainland via causeway pipe (500m) - €120K

Distance & ESG Design (Until FS):

Function as Stop-Over Hub:

Investor Note - Risk Disclosed: 6ha rain forest island at 500m offshore has no potable water - well test confirms saline intrusion. This is common for coastal islands in Guinea. Mitigation: €85K solar RO + rainwater + 500m pipe from mainland included in Section Seven Financials. Preserving 4ha forest reduces water demand. Main port at 4,000m offshore will have own 50m³/day desalination. FS will include full hydrogeological survey to confirm no freshwater lens. Until FS, base case = zero freshwater on island.